Sartorius Campus expands: Official opening of the new manufacturing facility for laboratory instruments

The largest single investment of Sartorius Campus totaling around 42 million euros

15-Sep-2017 - Germany

With its new facility for the manufacture of laboratory instruments, Sartorius provides high-quality production conditions and an advanced, efficient work environment. The biopharmaceutical and laboratory equipment supplier officially opened its approximately 42-million-euro new building as part of Sartorius Campus in the presence of some 250 guests, including Lower Saxony's Governor, Stephan Weil, and the Mayor of the City of Goettingen, Rolf-Georg Köhler. Around 450 employees build laboratory instruments, such as balances, ultrapure water systems and moisture analyzers, at this facility covering about 25,000 square meters, or nearly 270,000 square feet, in the industrial zone of Grone in Goettingen.

Sartorius AG

The production facility, to which the State of Lower Saxony and the German federal government together contributed 4.2 million euros, represents the largest single investment of Sartorius Campus.  On the whole, Sartorius is investing around 500 million euros in its Campus up to completion of construction scheduled for the end of 2018. The new Group headquarters will combine two Goettingen sites and, apart from providing more capacity for manufacture and administration, offers an attractive work environment. Moreover, the Campus grounds covering around 170,000 square meters, or 1,829,865 square feet, can be used to further expands its facilities.

The new building combines different manufacturing sites, formerly spread out at various locations, all under one roof: parts manufacture, prototype construction, calibration center, an extended vocational training workshop and an administration complex. Glass expanses of close to 7,000 square meters, or 75,350 square feet, provide plenty of daylight throughout all areas of the building; a modern office design permits efficient work. As highly accurate balances are also calibrated inside, the building is protected from temperature fluctuations and protected by a foundation isolated from vibration by decoupling.

Other news from the department manufacturing

These products might interest you

Milli-Q® IQ 7000

Milli-Q® IQ 7000 by Merck

An ultrapure Type 1 water purification system designed with you in mind

Consistent production of superior-quality ultrapure water

ultrapure water systems
Milli-Q IQ® 7003/05/10/15

Milli-Q IQ® 7003/05/10/15 by Merck

Integrated Ultrapure & Pure Water Systems Designed to simplify your daily lab life

Ultrapure and pure water of the highest quality directly from tap water

water treatment systems
Milli-Q® IX 7003/05/10/15

Milli-Q® IX 7003/05/10/15 by Merck

Consistent and Reliable Type 2 Pure Water Quality

Reliable Pure Type 2 Water Purification Systems for results reproducibility & Lab productivity

ultrapure water systems
Milli-Q® Services / MyMilli-Q™

Milli-Q® Services / MyMilli-Q™ by Merck

Services & Support for Water Purification Systems

Quality Care, Delivered. In Person & Online

water treatment systems
Milli-Q® SQ 2Series

Milli-Q® SQ 2Series by Merck

A new way to think about ultrapure water

A Robust System for your Essential Science

water purification systems
Loading...

Most read news

More news from our other portals